Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · CFR · Title 14 — Aeronautics and Space · Part 101 — Moored Balloons, Kites, Amateur Rockets, and Unmanned Free Balloons · § 101.29

§ 101.29. Information requirements.

331 words·~2 min read·/us/cfr/t14/s§ 101.29·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)Class 2—High-Power Rockets. When a Class 2—High-Power Rocket requires a certificate of waiver or authorization, the person planning the operation must provide the information below on each type of rocket to the FAA at least 45 days before the proposed operation. The FAA may request additional information if necessary to ensure the proposed operations can be safely conducted. The information shall include for each type of Class 2 rocket expected to be flown:
(1)Estimated number of rockets,
(2)Type of propulsion (liquid or solid), fuel(s) and oxidizer(s),
(3)Description of the launcher(s) planned to be used, including any airborne platform(s),
(4)Description of recovery system,
(5)Highest altitude, above ground level, expected to be reached,
(6)Launch site latitude, longitude, and elevation, and
(7)Any additional safety procedures that will be followed.
(b)Class 3—Advanced High-Power Rockets. When a Class 3—Advanced High-Power Rocket requires a certificate of waiver or authorization the person planning the operation must provide the information below for each type of rocket to the FAA at least 45 days before the proposed operation. The FAA may request additional information if necessary to ensure the proposed operations can be safely conducted. The information shall include for each type of Class 3 rocket expected to be flown:
(1)The information requirements of paragraph
(a)of this section,
(2)Maximum possible range,
(3)The dynamic stability characteristics for the entire flight profile,
(4)A description of all major rocket systems, including structural, pneumatic, propellant, propulsion, ignition, electrical, avionics, recovery, wind-weighting, flight control, and tracking,
(5)A description of other support equipment necessary for a safe operation,
(6)The planned flight profile and sequence of events,
(7)All nominal impact areas, including those for any spent motors and other discarded hardware, within three standard deviations of the mean impact point,
(8)Launch commit criteria,
(9)Countdown procedures, and
(10)Mishap procedures. [Docket FAA-2007-27390, 73 FR 73781, Dec. 4, 2008, as amended by Docket FAA-2007-27390, 74 FR 31843, July 6, 2009]
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.